\*\*In short:\*\* OEE multiplies Availability, Performance, and Quality into one score for how productively your equipment runs. Mantsu feeds all three factors automatically from registered downtimes, confirmations, and scrap.

**Overall Equipment Effectiveness (OEE)** is the manufacturing industry standard for measuring how productively a machine or production line is being used. An OEE score of 100% means you are producing only good parts, as fast as possible, with no unplanned stops.

OEE is not a single number. It is the product of three factors, each measuring a different type of loss:

![OEE as the product of the Availability, Performance, and Quality factors](https://api.archbee.com/api/optimize/SF4pEob92FmogaKDAJK7e/jwre0hBB8Je6FkxYL-rMc_image.png)

Mantsu captures all the data needed to calculate OEE directly from operator interactions on the shop floor.

## The Time Model

To understand OEE, it helps to think in terms of time. Every loss "eats into" the available production time, layer by layer:

![OEE time model waterfall from total available time down to fully productive time](https://api.archbee.com/api/optimize/SF4pEob92FmogaKDAJK7e/spP6ks137p3mAJHM14Bgi_image.png)

*Each row shows how much productive time remains after each layer of loss is removed.*

| Time Block                | What it represents                                                    |
| ------------------------- | --------------------------------------------------------------------- |
| **All Time**              | Every minute of every day (24/7)                                      |
| **Planned Prod. Time**    | The time your equipment is scheduled to run (shifts, calendars)       |
| **Run Time**              | Planned time minus downtime events; the machine was actually running  |
| **Net Run Time**          | Run time minus performance losses; the machine ran at its ideal speed |
| **Fully Productive Time** | Net run time minus quality losses; only good parts were produced      |

The goal of OEE is to maximise **Fully Productive Time**.

## Availability

**Availability** measures how much of your planned production time the equipment was actually running.

:::hint{type="info"}
**Availability&#x20;**= Run time / Planned Production Time
:::

Any event that stops production for a meaningful period counts as an **Availability Loss**:

| Loss type           | Examples                                    | In Mantsu                                                                                                     |
| ------------------- | ------------------------------------------- | ------------------------------------------------------------------------------------------------------------- |
| **Unplanned stops** | Machine breakdown, material shortage        | Registered with a dedicated reason code in the **Downtimes Manager & via the Order Cockpit** for the operator |
| **Planned stops**   | Changeover, scheduled maintenance, cleaning | Scheduling                                                                                                    |

In Mantsu, every downtime event has a **start time**, **stop time**, and **reason code** drawn from the configured reason tree. This makes it possible to see exactly which stop types are hurting your availability and where to focus improvement.

:::hint{type="info"}
100% availability means no stops occurred during planned production time.
:::

## Performance

**Performance** measures whether the equipment ran at its maximum theoretical speed during the time it was running.

The maximum theoretical speed needs to be set correctly in master data & can vary per product, or this factor can exceed 100%, which does not provide a correct total OEE.

:::hint{type="info"}
**Performance&#x20;**= Net Run Time / Run Time
or equivalently: **Performance&#x20;**= Actual Output / Theoretical Output
:::

Performance Loss captures two subtleties that are easy to miss:

| Loss type         | Description                                              | In Mantsu                                                                          |
| ----------------- | -------------------------------------------------------- | ---------------------------------------------------------------------------------- |
| **Short stops**   | Brief interruptions too short to log as a downtime event | Automatically captured below the **short stop threshold** in the Downtimes Manager |
| **Reduced speed** | Machine running, but slower than the ideal cycle time    | Derived from confirmed quantities vs. the expected rate for the order              |

The Order Cockpit records **confirmations** (actual output) against production orders that carry a planned quantity and planned time window. The gap between what was produced and what could have been produced at full speed is your Performance Loss.

:::hint{type="info"}
100% performance means that the process ran at its theoretical maximum speed whenever it was running.
:::

## Quality

**Quality** measures what fraction of the output was good on the first pass: no rework, no scrap.

:::hint{type="info"}
Quality = Good Output / Total Output
:::

Quality Loss is straightforward but costly because you already spent availability and performance time producing parts that cannot be shipped:

| Loss type            | Description                                       | In Mantsu                                                              |
| -------------------- | ------------------------------------------------- | ---------------------------------------------------------------------- |
| **Scrap**            | Parts that must be discarded entirely             | Registered per order in the **Order Cockpit** with a scrap reason code |
| **Rework / rejects** | Parts that fail inspection and need re-processing | Captured through **failed inspection lots** in the QM module           |

Because scrap is logged with a reason code and linked to a material and order, Mantsu gives you the traceability to understand *why* quality losses occur, not just how many.

:::hint{type="info"}
100% quality means every confirmed part is produced first-time right and passed inspection with no scrap and no rework.
:::

## How do you calculate OEE?

A simple example with real numbers:

![Example OEE calculation combining the availability, performance, and quality factors](https://api.archbee.com/api/optimize/SF4pEob92FmogaKDAJK7e/Tg0P9bRvedP4px8UtlhEn_image.png)

Even when each individual factor looks reasonable, the combined OEE reveals a significant amount of lost capacity.

World-class OEE is generally considered to be around **85%**. Most manufacturing operations start between 40% and 60%, which highlights how much untapped capacity typically exists.

## How does Mantsu support OEE?

Mantsu does not calculate OEE automatically out of the box, but it captures all the raw data needed to do so:

| OEE Factor       | Data source in Mantsu                                                           |
| ---------------- | ------------------------------------------------------------------------------- |
| **Availability** | Downtime events with reason codes (Downtimes Manager)                           |
| **Performance**  | Confirmed quantities vs. planned quantities per order (Order Cockpit)           |
| **Quality**      | Scrap registrations with reason codes + inspection results (Order Cockpit + QM) |
| **Planned time** | Shift and calendar definitions (Core: Shift & Calendar Management)              |

This data can be exposed through the **Insights** module or via an external reporting layer to calculate and visualize OEE per equipment, shift, or time period.

## Why does OEE matter?

OEE turns shop floor activity into a single, comparable score. More importantly, the three underlying factors tell you *where* your losses are coming from:

- A low **Availability** score points to your Downtimes Manager data: which reason codes appear most?
- A low **Performance** score points to short stops and speed losses: are operators clearing micro-jams that never get logged?
- A low **Quality** score points to scrap and inspection data: which materials or operations produce the most rejects?

By connecting OEE analysis to the structured, operator-captured data in Mantsu, you move from a lagging indicator to an actionable improvement loop.

***

## Frequently asked questions

**What is a good OEE score?**
An OEE of around 85% is commonly cited as world class for discrete manufacturing, but the most valuable use of OEE is tracking your own trend over time and comparing like with like.

**Where does Mantsu get the OEE data?**
From normal operator interactions: downtime registrations feed Availability, confirmations and machine counters feed Performance, and scrap registrations feed Quality. No separate data entry is needed.

**What is the difference between a downtime loss and a performance loss?**
A downtime loss is a registered stop with a reason code. A performance loss is time lost while the machine keeps running, such as reduced speed or short stops below the threshold.